Locory Every place has a story.
Login Sign Up
My Account
Open Map Create a Locory My Locories Featured Regions Leaderboard About What is a Locory? Collaboration Blog Feedback
Login Sign Up
My Account
  1. Home
  2. Removal of the elevated Central Artery (the 'Big Dig')
Locory page

Removal of the elevated Central Artery (the 'Big Dig')

By Seeker 6mo ago
See on map
Removal of the elevated Central Artery (the 'Big Dig') photo 1
Removal of the elevated Central Artery (the 'Big Dig') photo 2
The elevated Central Artery (Interstate 93) that ran through downtown Boston was demolished and replaced by tunneled roadways as part of the Central Artery/Tunnel Project (commonly called the Big Dig), with major work completed in the 1990s–2000s. The removal of the elevated highway eliminated a prominent aboveground roadway that had divided neighborhoods and created the surface-level Rose Kennedy Greenway over its former corridor. The project is widely cited as the physical disappearance of the old arterial elevated structure through downtown Boston.
Tags
Art / Graffiti Local Community Disappearances Tunnels
Location
42.360324, -71.059102
Views
1

Comments

0
Be the first to comment!
Share
S
Locory name
Location details
Link to share
Link copied to clipboard
Report Locory
Locory

Discover, share, and explore community-driven points of interest with Locory.

Follow Us

About Contact Documentation Collaboration Upcoming Privacy Policy Terms of Service Accessibility Mailing List Wiki